Sales Coach

Faucet · Brian Walsh

Customer's faucet, failing shutoff valves

Sales director working from home today, in and out of calls. Wants this handled quickly.

What you know walking in

Scheduled install. Customer bought a new pull-down kitchen faucet and wants it installed today. Two-story home built in 1994. Not a member.

  • Customer-supplied pull-down kitchen faucet, 0 yrs
  • Two multi-turn shutoff valves under the kitchen sink, 32 yrs
  • Old kitchen faucet

What you found

  • The hot shutoff under the sink does not close all the way. Water keeps flowing with the handle turned off.
  • The cold shutoff leaks at the stem when it is turned. It may keep dripping after the install.
  • To swap the faucet safely, the water to the whole house has to be shut off at the main.
  • The new faucet and the sink are in good shape. It is a single-hole install with a deck plate.

Your price book for this job

Install the faucet only

Remove and haul away the old faucet · Install your new faucet with new supply lines · Water shut off at the main during the install · Leak test · Old shutoff valves stay in place

$295

Install the faucet and replace both shutoffs Fits this home

Everything in the install option · Two new quarter-turn shutoff valves · Leak test of the new valves at full pressure

$595

The honest fit is marked. Recommend what the home needs, and only that.

Your goal

Show him the hot valve that will not shut off, keep it short, and recommend replacing both valves while the water is off. State the price clearly and let him decide.

Difficulty: Warm-up

Plan you can offer

  • Summit Care Club$19.95 a month

Speak naturally. Brian hears you, reacts to how you say things, and remembers. Headphones make it feel real.